Business and property-manager worksheet

Build a commercial restoration response plan before the loss.

Build a commercial restoration response plan that records decision-makers, building-system contacts, access rules, occupied areas, work-zone controls and the daily reporting path in one printable plan, built before a loss happens instead of assembled from memory in the middle of one.

Complete this before a loss and review it when contacts, tenants or systems change. Nothing is sent or saved.

Decision-makers

Building systems

Property access

Daily restoration control

First-hour building summary

Restoration handoff requirements

Why a commercial plan is written before the loss

A commercial loss puts more people in the way than a house fire or flood does: tenants, employees, customers, the building owner, the property manager, an insurer, and often several contractors. The plan exists so that the first hour is not spent finding out who is allowed to approve emergency work. The most useful entry in the worksheet is the person authorized to approve spending, with a named backup for after hours.

Building systems are the second priority. Know where the water and gas shutoffs are and who holds the keys. Sprinkler and fire-alarm contacts matter because a system impaired for repair or drying needs to be reported and tracked, and an impairment left unattended can create an insurance problem of its own. Elevators, HVAC and access control matter because contaminated air can move through shared ductwork, and restoration crews may need the air handlers shut down or isolated.

Access and occupancy come next: where equipment can be brought in, which areas are sensitive, what the operating hours are, and how tenants will be told. Restricted areas such as server rooms, pharmacies, labs, food-preparation areas and records storage change how the work is contained. Write down the loading route, because a crew that cannot bring a dehumidifier through the building is a crew that cannot start.

The daily restoration control section is what holds a multi-day job together. Agree on a zone naming convention so that a report from one person means the same thing to the next, decide who receives the daily update and at what time, and record how scope and cost approvals will be handled. Finally, agree on what the handoff will contain: photographs, moisture readings, equipment logs, contents records and completion documents, which are the same records a commercial insurer will want for a business-interruption claim.

Need the restoration work started?

Send the property address and damage details.

The planning tools are optional. You can request service with a short description and let the restoration professional inspect the property.

Request restoration service
Request service